the bidding construction projects, €65 million allocated, the new indoor arena of the capital of Romania, Bucharest:
Main conditions
minimum 12000 seats (2000 movable seating & 400 VIP sector)
40048 sqm area
31 meters height (4-5 levels)
parking 10000 sqm (minimum 450 places)
LED panels (exterior projections)
fast switch between a possible handball match in the morning and a concert in the evening, large technical area that should also include a space for trucks
Future tenants
2017 European Women's Artistic Gymnastics Championships (official)
2017/2018 EHF Women's Champions League Final Four (intention)
2018 UEFA Futsal Euro (intention)
2020 UEFA European Football Championship press centre (pending bid)
ETC.
the construction will start in September, everying is done only a project to be chosen from the two bids.